Industrial Controls Designer & Engineer

PLC, HMI & SCADA systems from
concept through commissioning

Four years integrator experience,
now independent

New builds • Upgrades • IEC 61131-3

Full project or phase support

Platforms & Scope

  • Siemens TIA Portal
  • WinCC / WinCC Unified
  • PLC software (IEC 61131-3)
  • FAT & commissioning
  • Contract delivery

UK Ltd • Insured • VAT Registered • Available this month

Based in Telford, West Midlands (View on Google Maps)

How I'm Typically Brought In:

+

New system design & development

Complete PLC/HMI architecture for new builds, machine controls, and greenfield automation projects

+

Engineering capacity during design phases

Structured programming and HMI development when internal resources are stretched

+

Legacy modernisation & upgrades

Plant control system replacement and integration with existing infrastructure

+

When projects need late-stage help

Commissioning support, integration troubleshooting, delivery recovery

Designer with
integrator-level capability,
available independently

Delivery Challenges I Address:

+

Complete system architecture

+

Structured IEC 61131-3 code

+

Late commissioning phases

+

Legacy system integration

+

HMI/SCADA development

Engineering Capability — Practical Delivery, Not Theory

Siemens TIA Portal PLC programming and industrial control systems
PLC Engineering

PLC Engineering

Industrial PLC work on live production systems

  • Siemens TIA Portal (S7-1200 / S7-1500)
  • Recovery, modification, and stabilisation of legacy or undocumented logic
  • HMI screen graphics (winCC, Unified, FactoryTalk View)
  • IEC 61131-3 (ST, FBD, LAD) structured code aligned with long-term support

Outcome:

Systems that run predictably, can be handed over, and don't generate callbacks.

Learn More →
WinCC Unified HMI and SCADA operator interfaces
HMI / SCADA Development

HMI / SCADA Development

Operator-focused HMI and SCADA systems

  • WinCC / WinCC Unified and industrial HMI platforms
  • Alarm management, navigation standards, ISA-aligned screen structures
  • Clean-up and rationalisation of inherited or inconsistent HMI's

Outcome:

Interfaces operators trust — not ones they work around.

Learn More →
Industrial commissioning and on-site engineering support
Commissioning & Engineering Support

Commissioning & Engineering Support

Hands-on delivery support when projects are at risk

  • On-site and remote commissioning support
  • Short-term capacity injection during peak or stalled phases
  • Support through FAT, SAT, final delivery, and handover

Outcome:

Commissioning phases that move forward instead of dragging on.

Learn More →

Tools & Platforms / Technology Stack

Tooling reflects systems worked on in live industrial projects,
not a marketing inventory.

PLC Platforms

  • Siemens TIA Portal (v17+)
  • Rockwell Studio 5000
  • Beckhoff TwinCAT 3

Standards & Languages

  • IEC 61131-3 (ST, FBD, LAD)
  • ISA-88
  • ISA-95

Networking & Fieldbus

  • PROFINET
  • Ethernet/IP
  • Modbus
  • OPC UA

HMI/SCADA

  • Aveva InTouch
  • WinCC / WinCC Unified
  • Wonderware Historian

Commissioning & Testing Tools

  • PLC online diagnostics & watch tables
  • IO checkout & loop testing procedures
  • Offline logic testing & simulation
  • Network diagnostics (PROFINET / Ethernet/IP)
  • FAT & SAT test frameworks
  • Commissioning documentation & handover

Common Questions

Practical answers to typical engagement queries

Primarily Siemens TIA Portal (S7-1200/S7-1500), Rockwell Studio 5000, and Beckhoff TwinCAT 3. I also work with Mitsubishi, Schneider, and Omron systems where required. If your platform isn't listed, get in touch — I can often accommodate specialist requests.
Yes. Remote support covers diagnostics, program modifications, and ongoing technical backup. On-site presence is required for commissioning, FAT/SAT, and physical integration work.
Initial response within 1–2 working days. For urgent commissioning support, lead time is typically 2–4 weeks depending on scope and location. Same-day response available for existing clients.
Yes. While based in the Midlands, I regularly travel UK-wide for commissioning projects, FAT support, and specialist delivery work. International projects considered on a case-by-case basis.
OEMs, system integrators, and end users across manufacturing, marine, energy, and process automation. Experience spans production lines, offshore systems, material handling, and safety-critical applications.
Weekend commissioning can be arranged to minimize production disruption. Emergency callout rates apply outside standard hours (Mon–Fri, 9am–5pm). Discuss urgency during initial contact.

Still have questions?

Get in touch

Commercial & Legal Assurance

Clear commercial status, professional, insurance, and regulatory coverage.

+

UK Limited Company

Company reg: 16773095

+

Public Liability Insurance

£5,000,000 - cover active

+

Professional Indemnity Insurance

£2,000,000 - cover active

+

Cyber Liability Insurance

£100,000 - cover active

+

VAT Registered

VAT reg: GB 503 8585 84

+

GDPR / ICO Registered

Reference number: ZC010078

Contractor status:
Outside IR35 (where applicable)

UK Ltd
Insured (PL £5m • PI £2m)
VAT Registered
GDPR / ICO Registered

Engineering Availability & Engagement

Current capacity, response expectations, and engagement parameters.

Availability

Current status: Accepting new engagements

Typical lead time:

2–4 weeks (subject to scope and location)

Response time:

1–2 working days